Product:
Robot gravity casting automation production line, it is turntable multi-station production line, robot instead of labour casting( just need 1-2 workers), PLC programming, robot online tracking casting, can achieve automatic release of aluminum skin, automatic opening and closing mold frame. For the production of aluminum, copper, brass products, high output, turntable size : diameter 8meter-10meter, with 14-16 sets gravity casting machine . Continuous robot pouring production line!
Robotic gravity casting automation production line layout:
Robotic gravity casting automation production line real photos:
Below is the installation of the Robotic gravity casting production line:
We have two type ravity casting lien to choose :
1. Robotic gravity casting production line ( such as above photos)
Characteristics:
14 stations, 10meter diameter turntable , one robot pouring, every 5-8minutes one circle(can according to product cooling time to set ),One robot can pouring different weight products, can come true artificial pick up or robot pick up, can according to customers' need to make( come true unmanned automation ) , one -two workers is enough.
2.Robotic gravity casting unit
Characteristics:
It have four stations or six stations pouring unit , one robot pouring, can pouring product with sand core,We have our own robot pouring copyrights software system, which we have gotten the patent and software writing Certification. such as below photos :
Company introduction:
We are a machine and automatic production line manufacturer in China. Mainly for metal and foam products equipment . Such as aluminum or brass gravity casting production line ,aluminum or brass gravity casting unit, PU foam products production line , gravity casting machine,high pressure PU foam machine ...., all our automatic production line with robot pouring , SIEMENS PLC programming, robot on line tracking pouring. We have our own patent and software copy rights. One production line with one or two workers is engough , one robot can pouring 14 stations . safe and high efficiency,
Certifications:
Delivery and package:
Payment term :
50% deposite by T/T, 45% paid before delivery , 5% paid after install the equipment in customer's factory.
Delivery time :
90days for production line, 35days for single machine( such as gravity casting machine,PU foam machine)
Installation :
Once the equipment reach customer's factory, we will arrange the workers to customer's company to install,test ,training .